Cable laying methods
1. What Is The Method Of Laying Cables In The Cable Trench?
Answer: The method of laying wires and cables in the cable trench is similar to laying direct burial cables. Generally, the pulley can be placed in the groove, the application is completed, the wire is placed in the bottom of the trench or on the support, and the cable is tied to the cable label.
2. What Is The Standard Equipment Used For Cable Laying?
Answer:
- Air compressor-mainly used to destroy the road surface and to prepare for the laying of cables later.
- Electric winch or cable tractor- mainly used to drag the cable.
- Cable conveyor- used in conjunction with the traction machine to overcome the considerable friction and reduce damage to the cable
- Cable tray discharge
- Roller devices
- Anti-twisting- to reduce the twisting of the wire rope
- Cable tray braking device
- Tension meter