Cable laying methods
1. What Are The Requirements For The Installation Distance Of The Bracket In The Cable Trench?
Answer:
- When the cable’s outside diameter is equal to or less than 50mm, support should be added every 1m
- When the outside diameter is greater than 50mm, cable support should be put in place every 0.6m.
- For a single cable in a triangle, every 1m should be tied firmly, and for a vertical device, every 1 ~ 1.5m has to have fixed support.
2. How To Deal With The Installation Of Power Cables And Control Cables In The Same Bracket?
Answer: Power cables and control cables should generally not be laid in the same bracket. However, in a scenario where the control wire and cable and power cable are laid in the same frame, a separation plate should be applied.